{"id":17,"date":"2026-05-09T06:42:15","date_gmt":"2026-05-09T06:42:15","guid":{"rendered":"http:\/\/localhost\/testhai\/?p=17"},"modified":"2026-06-10T10:12:33","modified_gmt":"2026-06-10T10:12:33","slug":"mechanical-work","status":"publish","type":"post","link":"https:\/\/www.tes-thai.com\/index.php\/2026\/05\/09\/mechanical-work\/","title":{"rendered":"MECHANICAL WORK"},"content":{"rendered":"<ul>\n<li><strong>THE ORIENTAL HOTEL<\/strong> : INSTALLATION OF MAKE-UP WATER SYSTEM AND SANITARY SYSTEM WITH CONTROL EQUIPMENT ; 2002<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-110 aligncenter\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/Screenshot-2026-06-10-at-17-06-39-THE-ORIENTAL-HOTEL-logo-\u0e04\u0e49\u0e19\u0e2b\u0e32\u0e14\u0e49\u0e27\u0e22-Google.png\" alt=\"\" width=\"184\" height=\"168\" \/><\/li>\n<li><strong>THE ORIENTAL HOTEL<\/strong> : INSTALLATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM (ADDITIONAL); 2002<\/li>\n<li><strong>THONBURI ENTERTAINMENT COMPLEX<\/strong> : REPAIRTION AND RENOVATION OF AIR CONDITIONING SYSTEM AND COOLING TOWER; 2003<\/li>\n<li><strong>JIENG FUTURE PLAZA. NONGKHAI PROVINCE :<\/strong> INSTALLATIN OF AIR VENTILATION; 2003<\/li>\n<li><strong>CHAN WANICH SECURITY PRINTING CO., LTD<\/strong>. : INSTALLATION OF AIR CONDITIONING SYSTEM; 2003<\/li>\n<li>CHAOPHRAYA PARK HOTEL : PROCUREMENT OF AIR CONDITIONING ACCESSORIES AND HEATING EQUIPMENT; 2003<\/li>\n<li><strong>JIRATIP VILLAGE (PHASE SOI WATCHARAPHOL)<\/strong> : PROCUREMENT AND INSTALLATION SPLIT TYPE UNIT 35 SETS; 2003<\/li>\n<li><strong>PHRAYATHAI 3 HOSPITAL<\/strong> : RENOVATION OF COOLING TOWER 1000 RT, 4 UNITS; 2003<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-112 size-full\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/phayathai3.jpg\" alt=\"\" width=\"485\" height=\"108\" srcset=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/phayathai3.jpg 485w, https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/phayathai3-300x67.jpg 300w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/li>\n<li><strong>CHALERMTHAI SHOPPING MALL (CHONBURI)<\/strong> : RENOVATION OF COOLING TOWER 350 RT, 4 UNITS; 2003<\/li>\n<li><strong>PACIFIC PARK (SRIRACHA, CHONBURI)<\/strong> : INSTALLATION OF SUPPLY AIR DUCT AND VENTILATION SYSTEM; 2003<\/li>\n<li><strong>ORIENTAL HOTEL<\/strong> : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR SAND FILTER TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2003<\/li>\n<li><strong>ORIENTAL HOTEL<\/strong> : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR ROOF TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2004<\/li>\n<li><strong>ONE TWO SING (SILOM RD.), ENTERTAINMENT COMPLEX<\/strong> : PURCHASING AND INSTALLATION WORK OF SPLIT TYPE UNIT AMOUNT 31 SETS; 2004<\/li>\n<li><strong>NARAI HOTEL<\/strong> : PURCHASING AND INSTALLATION WORK OF CIRCULATING WATER PUMP FOR CHILLER WATER SYSTEM AMOUT 6 SETS; 2004<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : PURCHASING AND INSTALLATION WORK OF WATER COOLED CHILLER 200 TR WITH ACCESSORIES 1 UNIT; 2004<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-114 size-full\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/tetrapak.jpg\" alt=\"\" width=\"135\" height=\"42\" \/><\/li>\n<li><strong>UTILITY BUSINESS ALLIANCE (NONG-KHAM, WATER TREATMENT PLANT)<\/strong> : PURCAHASING SYNTHETIC FILTER FOR AIR CONDITIONING SYSTEM; 2004<\/li>\n<li><strong>THAI NOK (AMATA CITY, CHOLBURI PLANT)<\/strong> : INSTALLATION WORK OF AIR COOLED CHILLER WITH EQUIPMENT AND ACCESSORIES; 2004<\/li>\n<li><strong>SIAM JUSCO, RUJCHADAPISEK BRANCH<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM ; 2004<\/li>\n<li><strong>Johnson &amp; Johnson<\/strong> : DESIGN AND INSTALLATION WORK OF HEAT EXCHANGER FOR COOLING AIR COMPRESSOR SYSTEM; 2004<\/li>\n<li><strong>SILOM COMPLEX<\/strong> : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : PURCHASING AND INSTALLATION WORK OF CONDENSER WATER PUMP WITH PIPING AND ACCESSORIES 1 UNIT; 2004<\/li>\n<li><strong>GRAND HYATT ERAWAN<\/strong> : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-115 size-full\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/grandhyatterawan.jpg\" alt=\"\" width=\"800\" height=\"250\" srcset=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/grandhyatterawan.jpg 800w, https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/grandhyatterawan-300x94.jpg 300w, https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/grandhyatterawan-768x240.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/li>\n<li><strong>BANK OF AYUDHYA, RAMA III HEAD OFFICE<\/strong> : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR TRAINING CENTER ON 16<sup>th<\/sup> FL; 2004<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116 size-full\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/bankofayudhya.png\" alt=\"\" width=\"280\" height=\"80\" \/><\/li>\n<li><strong>BANK OF AYUDHYA, RAMA III HEAD OFFICE<\/strong> : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR FOREIGN BANKNOTE ON BASEMENT 1; 2005<\/li>\n<li><strong>HI-MALL, (MACKRO) BANGKABUE<\/strong> : CONSULTANT OF ENGINEERING SYSTEM; 2005<\/li>\n<li><strong>MUANG-THAI LIFE ASSURANCE BUILDING (RAJCHADAPISEK RD.), HEAD OFFICE : RENOVATION WORK OF TRAINGING CENTER 12<sup>th<\/sup> FL; 2005<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-117 size-full\" src=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/muangthailife.png\" alt=\"\" width=\"500\" height=\"300\" srcset=\"https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/muangthailife.png 500w, https:\/\/www.tes-thai.com\/wp-content\/uploads\/2026\/05\/muangthailife-300x180.png 300w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/strong><\/li>\n<li><strong>WYNCOAST INDUSTRIAL PARK (PUBLIC) CO., LTD., FACTORY AT BANPAKONG, CHACHEANGSAO : RENOVATION OF AIR CONDITIONING SYSTEM; 2005<\/strong><\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : RENOVATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005<\/li>\n<li><strong>MISTER DONUT, HI-MALL, (MACKRO) BANGKABUE<\/strong> : INSTALATION OF MAIN SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM; 2006<\/li>\n<li><strong>PANYA ELECTRONICS BUILDING<\/strong> : INSTALLATION OF 18 SETS OF SPLIT TYPE ; 2006<\/li>\n<li><strong>SARABURI HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING 1<sup>ST<\/sup> &amp; 2<sup>ND<\/sup> FLOOR ; 2006<\/li>\n<li><strong>BANK OF AYUDHYA, PLOEN-JIT BRANCH<\/strong> : RENOVATION WORK OF INSULATING FOR CHILLED WATER PIPIPING ; 2006<\/li>\n<li><strong>RAWIWARIN RESORT<\/strong> : INSTALLATION OF AIR CONDITIONING FOR YACHT<\/li>\n<li><strong>UOB BANK<\/strong> : INSTALLATION OF AIR CONDITIONING FOR CONTROL ROOM ; 2006<\/li>\n<li><strong>CENTRAL-BIG C, HUA-MAK BRANCH<\/strong> : RENOVATION OF AIR CONDITIONING ; 2006<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR WORK OF AIR CONDITIONING SYSTEM AT CORIDOOR OF RATANAKOSIN BALL ROOM ; 2007<\/li>\n<li><strong>JIENG FUTURE PLAZA, NONG-KHAI<\/strong> : INSTALLATION OF AIR CONDITIONING &amp; FIRE FIGHTING SYSTEM ; 2007<\/li>\n<li><strong>BUPA CROSS<\/strong> : RENOVATION OF AIR CONDITIONING FOR SERVER ROOM ; 2007<\/li>\n<li><strong>ROYAL GARDEN PLAZA<\/strong> : INSTALLATION OF AIR DUCT FOR AIR CONDITIONING SYSTEM ; 2007<\/li>\n<li><strong>TEIJIN, THAILAND<\/strong> : INSTALLATION OF HIGH VOLTAGE WATER COOLEDCHILLER ; 2007<\/li>\n<li><strong>THAI LIFE ASSURANCE, TAIKISHA : REPLACEMENT COMPRESSOR OF WATER COOLED PACKAGED ; 2007<\/strong><\/li>\n<li><strong>UOB<\/strong> : RENOVATE CHILLED WATER SYSTEM ; 2007<\/li>\n<li><strong>UOB<\/strong> : RENOVATE CHILLED WATER SYSTEM ; 2007<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR CONDENSER WATER PUMP #2 ; 2007<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR CHILLED WATER PUMP #2 ; 2007<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR CHILLED WATER PUMP #3 ; 2007<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR CHILLED WATER PUMP #3 222 BUILDING ; 2007<\/li>\n<li><strong>BANK OF AYUDHYA, PLEONJIT<\/strong> : INSTALLATION OF WATER COOLED CHILLER 425 TR ; 2007<\/li>\n<li><strong>UOB<\/strong> : RENOVATE CHILLED WATER SYSTEM ; 2007<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING<\/strong> : INSTALLATION OF AHU 20TR x 4SETS (BIG BOX) ; 2008<\/li>\n<li><strong>UOB<\/strong> : REPAIR AIR CONDITION 19 FLOOR, ROBOT BUILDING ; 2008<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING<\/strong> : 10 TR PACKAGED AIR RENTAL FOR BIG BOX ; 2008<\/li>\n<li>TETRAPAK (THAI) : REPAIR LEAKAGED OF CHILLER NO. 2 &amp; 3 ; 2008<\/li>\n<li><strong>UOB (AYUDHYA)<\/strong> : REPAIR AHU ; 2008<\/li>\n<li><strong>UOB (SUKHUMWIT 26)<\/strong> : SECURITY ROOM ; 2008<\/li>\n<li><strong>UOB<\/strong> : INSTALLATION OF AIR CONDITION FOR COUNTER SERVICE \/RO ; 2008<\/li>\n<li><strong>UOB<\/strong> : REPAIR AIR CONDITIN FOR MOBILE CAR ; 2008<\/li>\n<li><strong>UOB<\/strong> : RENOVATION OF SUPPLY AIR DUCT, SERVER ROOM 7 FLOOR, ROBOT BUILDING ; 2008<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : PACKAGED AIR RENTAL ; 2008<\/li>\n<li>UOB : REPAIR AIR CONDITIN FOR UPS1000K ROOM ; 2008<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR CONDENSER WATER PUMP #1 ; 2008<\/li>\n<li>UOB : INSTALL CHILLED WATER PIPE IN STRONG ROOM ; 2008<\/li>\n<li><strong>UOB<\/strong> : REPAIR AIR CONDITION SERVER ROOM, 7 FLOOR ; 2008<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR CHILLER NO.1 (RCU 80 wx) ; 2008<\/li>\n<li><strong>MUANG-THAI LIFE ASSURANCE BUILDING (RAJCHADAPISEK RD.),<\/strong> HEAD OFFICE : RENOVATION WORK OF WATER COOLED PACKAGED AIR CONDITION FOR MUANG THAI LIFE ASSURANCE AUDITORIUM ; 2008<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR CHILLER 2 (RCU\u00a0 240 wx) ; 2008<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM FOR WAREHOUSE AT SINSAKORN PLANT ; 2008<\/li>\n<li><strong>UOB<\/strong> : REPAIR AIR CONDITION , 19 FLOOR ; 2008<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALL AIR CONDITION FOR SERVER ROOM 2nd FLOOR ; 2008<\/li>\n<li><strong>RAYONG ENGINEERING AND PLANT SERVICE CO.,LTD. (REPCO)<\/strong> : RENOVATION OF OFFICE VENTILATION ; 2008<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : AIR COOLED CHILLER 100 TR RENTAL ; 2008<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR MOTOR CONDENSER WATER PUMP #3 ; 2008<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR SPARE MOTOR ; 2008<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : AIR COOLED CHILLER RENTAL ; 2008<\/li>\n<li><strong>UOB<\/strong> : INSTALL MOTORIZED CONTROL VALVE, SOFTWARE PARK BRANCH ; 2008<\/li>\n<li><strong>UOB<\/strong> : INSTALL COMPRESSOR FOR COUNTER SERVICE ROOM, ROBOT BUILDING ; 2008<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPLACE PLATE HEAT EXCHANGE FOR CHILLER NO. 1 &amp; 2 ; 2008<\/li>\n<li><strong>UOB<\/strong> : RENOVATE AHU 11th FLOOR (AHU11B) ; 2009<\/li>\n<li><strong>UOB<\/strong> : RENOVATE Fresh &amp; Exhaust Air, SUKHUMWIT 26 BRANCH ; 2009<\/li>\n<li><strong>UOB<\/strong> : INSTALLATION OF AIR CLEANNER AT BASEMENT FLOOR, SUKHUMWIT 26 BRANCH ; 2009<\/li>\n<li><strong>SIAM TOPPAN PACKAGING CO.,LTD<\/strong> : AUDIT CHILLER EFFICIENCY ; 2009<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPLACE COMPRESSOR FOR TELEPHONE ROOM 1st FLOOR ; 2009<\/li>\n<li><strong>UOB<\/strong> : INSTALLATION OF AIR CONDITION FOR MAILING ROOM ; 2009<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPLACE COMPRESSOR FOR SERVER ROOM 3rd FLOOR ; 2009<\/li>\n<li><strong>BUPA HEALTH INSURANCE (THAILAND)<\/strong> : REPLACE COMPRESSOR ; 2009<\/li>\n<li><strong>UOB<\/strong> : ULTRA SONIC FLOW MEASUREMENTFOR AHU AT BASEMENT &amp; GROUND FLOOR, SUKHUMWIT 26 BRANCH ; 2009<\/li>\n<li><strong>UOB<\/strong> : RENOVATE AIR CONDITION FOR GOOD WOOD BUILDING, 5th FLOOR ; 2009<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : RENOVATE COOLING TOWER ; 2009<\/li>\n<li><strong>UOB<\/strong> : RENOVATE AIR CONDITION FOR SERVER ROOM, 7th FLOOR ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF WATER COOLED CHILLER PLANT FOR SINSAKORN PLANT ; 2009<\/li>\n<li><strong>WISMA ASIA<\/strong> : INSTALLATION OF WATER COOLED AIR CONDITION FOR SERVER ROOM, HEAD OFFICE ; 2009<\/li>\n<li>P<strong>ATHUMWAN PRINCESS HOTEL BANGKOK<\/strong> : REPLACE COMPRESSOR FOR AIR CONDITION, 6th FLOOR ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AHU FOR AFTER PRESS PROJECT (PHRAPRADAENG PLANT) ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REPAIR AIR CONDITION FOR THANACHART-WONGSAWANG BRANCH ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF FIRE FIGHTING PIPELINE IN TRENCH FOR SINSAKORN PLANT ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUT AIR SYSTEM FOR CTP ROOM (PHRAPRADAENG PLANT) ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUT AIR SYSTEM FOR ARTWORK ROOM <strong>(PHRAPRADAENG PLANT) ; 2009<\/strong><\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUT AIR SYSTEM FOR PERSO ROOM (PHRAPRADAENG PLANT) ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUT AIR SYSTEM FOR SM52 (PHRAPRADAENG PLANT) ; 2009<\/li>\n<li><strong>UOB<\/strong> : INSTALLATION OF AIR CLEANER FOR COUNTER SERVICE 1 ; 2009<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR BREAK DOWN AHU 3\/2 ; 2009<\/li>\n<li><strong>NARAI HOTEL<\/strong> : REPAIR MOTOR, CDP NO. 2 ; 2009<\/li>\n<li><strong>UOB<\/strong> : REPAIR AIR CONDITON FOR MAILING ROOM, SATORN BUILDING ; 2009<\/li>\n<li><strong>SKYY HOTEL, SUKHUMVIT<\/strong> : INSTALLATION OF VRF ; 2009<\/li>\n<li><strong>NATIONAL LIBRARY OF THAILAND<\/strong> : INSTALLATION OF AIR CONDITONING SYSTEM UNDER AUTHORIZED BY JCI ; 2009<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR CO-WATER PUMP (PRESSURE TUBE) ; 2009<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REMOVE &amp; INSTALLATION OF VENTILATION SYSTEM FOR INDIGO (PHRAPRADAENG PLANT) ; 2009<\/li>\n<li><strong>NARAI HOTEL<\/strong> : OVERHAUL SPARE MOTOR, CHP ; 2010<\/li>\n<li><strong>NARAI HOTEL<\/strong> : OVERHAUL MOTOR, CHP NO.2 ; 2010<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REPAIR AIR CONDITION, BH96YGAT (PHRAPRADAENG PLANT) ; 2010<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR AIR CONDITION FOR ENGINEERING ROOM, 1st FLOOR ; 2010<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPAIR EXHAUST FAN, ROOF FLOOR ; 2010<\/li>\n<li><strong>SKYY HOTEL, SUKHUMVIT<\/strong> : INSTALLATION OF VENTILATION SYSTEM ; 2010<\/li>\n<li><strong>TETRAPAK (THA<\/strong>I) : SITE SURVEY WATER PLUMBING ; 2010<\/li>\n<li><strong>UOB<\/strong> : REMOVE AIR CONDITION SYSTEM AND INSTLL FROM MUANGTHONG BRANCH TO SUKHUMVIT 26 BRANCH ; 2010<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : RENOVATE AHU 3\/3 ; 2010<\/li>\n<li><strong>PTT HEAD OFFICE<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM UNDER AUTHORIZED BY JCI ; 2010<\/li>\n<li><strong>GRAND HYATT ERAWAN<\/strong> : BREAKDOWN CW PIPING ; 2010<\/li>\n<li><strong>DATA PRODUCT TOPPAN FORMS<\/strong> : RENOVATION OF CHILLER PLANT AIR COOLED TO WATER COOLED UNDER AUTHORIZED BY JCI ; 2010<\/li>\n<li><strong>BUPA HEALTH INSURANCE (THAILAND)<\/strong> : REPAIR OF CONDENSING UNIT ; 2010<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : AIR COOLED CHILLER 200 TR RENTAL ; 2010<\/li>\n<li><strong>TETRAPAK (THAI)<\/strong> : REPLACE DRAINAGE PUMP OF AIR CONDITION ; 2010<\/li>\n<li><strong>PAOLO MEMORIAL NAWAMIN<\/strong> : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 3 ; 2010<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT 500 TR x 2 SETS WATER COOLED CHILLER, BUILDING 1 ; 2010<\/li>\n<li><strong>PHYATHAI 1 HOSPITAL<\/strong> : INSTALLATION OF AIR CONDITION ; 2010<\/li>\n<li><strong>Narai Hotel<\/strong> : REPAIR CONDENSER PUMP NO. 3 &amp; CHILLED WATER PUMP NO. 3 ; 2010<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AIR CONDITION (PHRAPRADAENG PLANT) ; 2010<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REPAIR AIR CONDITION, BH96YGAT (PHRAPRADAENG PLANT) ; 2010<\/li>\n<li><strong>PAOLO MEMORIAL NAWAMIN<\/strong> : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 2 ; 2011<\/li>\n<li><strong>PHYATHAI 1 HOSPITAL<\/strong> : INSTALLATION OF AIR CONDITION ; 2011<\/li>\n<li><strong>BUPA HEALTH INSURANCE (THAILAND)<\/strong> : INSTALLATION OF AIR CONDITION ; 2011<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REPAIR CHILLED WATER PUMP NO.1 FOR SINSAKORN PLANT ; 2011<\/li>\n<li><strong>PHYATHAI 1 HOSPITAL<\/strong> : INSTALLATION OF AIR CONDITION FOR MARKETING ROOM ; 2011<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALL BALANCING VALVE FOR CHILLER NO.2, BUILDING 4 ; 2011<\/li>\n<li><strong>JOHNSONS &amp; JOHNSONS<\/strong> : CLEANING PLATE HEAT EXCHANGER ; 2011<\/li>\n<li><strong>BANK OF AYUDHYA &#8211; PLOENJIT BRANCH<\/strong> : REPLACEMENT OF 425 TR WATER COOLED CHILLER UNDER AUTHORIZED BY JCI ; 2011<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF BUTTERFLY VALVE FOR HVAC PIPE, BUILDING 1 ; 2011<\/li>\n<li><strong>PHYATHAI 1 HOSPITAL<\/strong> : INSTALLATON OF AIR CONDITION ; 2011<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LT<\/strong>D : INSTALLATION OF AHU 10 TR x 4 SETS FOR BIG BOX (PHRAPRADAENG PLANT) ; 2011<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF AIR HANDLING UNIT FOR RESTAURANT 2ND FLOOR, BUILDING 1 ; 2011<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AC FOR CONTROL ROOM (PHRAPRADAENG PLANT) ; 2011<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF AIR HANDLING UNIT FOR INPATIENT DEPARTMENT(IPD) LOBBY 2ND FLOOR, BUILDING 1 ; 2011<\/li>\n<li><strong>UOB<\/strong> : RENOVATE CW PIPE SUKHUMVIT 26 BRANCH ; 2011<\/li>\n<li><strong>PAOLO MEMORIAL NAWAMIN<\/strong> : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 1 ; 2012<\/li>\n<li><strong>UOB<\/strong> : RENOVATE TRANSFER AIR GRILLE SUKHUMVIT 26 BRANCH ; 2012<\/li>\n<li><strong>CHILDREN HOSPITAL<\/strong> : RENOVATE AIR CONDITIONING FOR EXAMINATION ROOM 3<sup>rd <\/sup>FLOOR ; 2012<\/li>\n<li><strong>PHYATHAI 3 HOSPITAL<\/strong> : REPLACEMENT OF CHILLED WATER PUMP ; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF AIR CONDITION FOR ENTERAL FEEDING ROOM 11<sup>th <\/sup>FLOOR, INTERVIEW ROOM 12<sup>th<\/sup> FLOOR, CONFERRENCE ROOM 11A &amp; 11B, BUILDING 1 ; 2012<\/li>\n<li><strong>CHILDREN HOSPITAL<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR BIOCHEMICAL LABORATORY 5<sup>th<\/sup> FLOOR ; 2012<\/li>\n<li><strong>UOB<\/strong> : REPLACEMENT CHEMICAL FEED TANK FOR CHILLER PLANT HEAD OFFICE, ROBOT BUILDING, SATHORN ROAD; 2012<\/li>\n<li><strong>CENTRAL PATTANA PUBLIC COMPANY LIMITED (CPN)<\/strong> : REPLACEMENT OF MAIN SOIL PIPE, CENTRAL RAMA 3; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : RENOVATE OF AIR CONDITION FOR DOCUMENT STORAGE ROOM, BUILDING 1 ; 2012<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AC FOR GROSS 3 (PHRAPRADAENG PLANT) ; 2012<\/li>\n<li><strong>DON MUEANG INTERNATIONAL AIRPORT<\/strong> : INSTALLATION OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2012<\/li>\n<li><strong>SHELL, RAMA 9 STATION<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012<\/li>\n<li><strong>UOB<\/strong> : WATER PIPE LEAK FIXXING AT PARKING LOT, HEAD OFFICE, ROBOT BUILDING, SATHORN ROAD; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF EXPANSION TANK FOR CHILLER PLANT, BUILDING 4 ; 2012<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : MODIFY HEADER OF CHILLED WATER PIPE IN CHILLER PLANT (PHRAPRADAENG PLANT) ; 2012<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF PNEUMATIC PIPE FOR CMC ROOM (PHRAPRADAENG PLANT) ; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF FIRE BARRIER IN SYSTEM SHAFT, BUILDING 1 ; 2012<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF CHILLED WATER AIR CONDITIONING FOR CMC ROOM (PHRAPRADAENG PLANT) ; 2012<\/li>\n<li><strong>T.S. ENGINEERING (2004) CO., LTD.<\/strong> : INSTALLATION OF VARIABLE REFRIGERANT FLOW (VRF) FOR HEAD OFFICE ; 2012<\/li>\n<li><strong>SHELL, BANGCHALONG STATION, SAMUTPRAKARN<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012<\/li>\n<li><strong>MICHELIN SIAM (NKE)<\/strong> : INSTALLATION AIR HANDLING UNIT 50 TR x 2 SETS FOR RETREAD AV ; 2012<\/li>\n<li>PAOLO MEMORIAL NAWAMIN : OVERHAUL CHILLED WATER PUMP # 3 ; 2012<\/li>\n<li><strong>CHILDREN HOSPITAL<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR ISOLATION ROOM 4th FLOOR ; 2012<\/li>\n<li><strong>SHELL, C.R.P. PETROLEUM LTD. STATION, CHONBURI<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012<\/li>\n<li><strong>LE MERIDIEN BANGKOK<\/strong> : INSTALLATION OF VENTILATION FAN FOR CAR PARKING ; 2012<\/li>\n<li><strong>WISMA ASIA<\/strong> : INSTALLATION OF AIR CONDITIONING FOR SERVER ROOM ; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF PRESSURE RELIEF VALVE FOR CHILLED WATER SYSTEM, BUILDING 1 ; 2012<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF FIRE BARRIER SYSTEM, BUILDING 1 ; 2013<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF CHILLER PLANT MANAGEMENT SYSTEM (CPMS) , BUILDING 1 &amp; 4 ; 2013<\/li>\n<li><strong>AJIYA SAFETY GLASS FACTORY (AMATA CHONBURI)<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM ; 2013<\/li>\n<li><strong>KIMPAI LAMITUBE CO., LTD<\/strong>. : INSTALLATION OF AIR COOLED CHILLER ; 2013<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : COMBINED OF CHILLER PLANT , BUILDING 1 &amp; 4 ; 2013<\/li>\n<li><strong>SHELL, LERTVANICH BRANCH 2 (DINDAENG) STATION, BANGKOK<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013<\/li>\n<li><strong>SHELL, CHONGNONTEE STATION, BANGKOK<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013<\/li>\n<li><strong>SHELL, LADPRAO STATION, BANGKOK<\/strong> : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013<\/li>\n<li><strong>CENTRAL PINKLAO<\/strong> : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2013<\/li>\n<li><strong>AIKCHOL HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR CCU &amp; CATH LAB UNDER AUTHORIZED BY JCI ; 2013<\/li>\n<li><strong>PAOLO MEMORIAL NAWAMIN<\/strong> : REPLACEMENT BUTTERFLY VALVE FOR COOLING TOWER ; 2013<\/li>\n<li><strong>TOTAL E&amp;P THAILAND (HEAD OFFICE)<\/strong> : REPLACEMENT OF AIR CONDITIONG SYSTEM FOR SERVER ROOM ; 2013<\/li>\n<li><strong>GRAND HYATT ERAWAN<\/strong> : REPLACEMENT OF PIPING ON FLOOR 19 ; 2013<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF CHILLED WATER AIR CONDITIONING FOR PROJECT BIG BOX ; 2013<\/li>\n<li><strong>STATE ENTERPRISE POLICY OFFICE (SEPO)<\/strong> : COMMISSIONING AIR CONDITIONING SYSTEM FOR HEAD OFFICE ; 2013<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REINSULATE CHILLED WATER PIPE IN RISER , BUILDING 1 ; 2013<\/li>\n<li><strong>YUASA BATTERY (THAILAND)<\/strong> : INSTALLATION OF SPOT COOLING FOR PRODUCTION LINE ; 2014<\/li>\n<li><strong>AIKCHOL 2 HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR OPD, ICU &amp; SSO UNDER AUTHORIZED BY JCI ; 2014<\/li>\n<li><strong>BEIERDORF<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM UNDER AUTHORIZED BY JCI ; 2014<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF PPR PIPE ON 19<sup>th<\/sup> FLOOR, BUILDING 1 ; 2014<\/li>\n<li><strong>NATIONAL BROADCASTING SERVICES OF THAILAND (<\/strong>NBT) : REPLACEMENT OF VSD SCREW AIR COOLED CHILLER 210 TR x 2 SETS AND COMMISSIONING ; 2014<\/li>\n<li><strong>CAPITAL MARKET ACADEMY (CMA)<\/strong> : INSTALLATION OF AIR CONDITONING SYTEM \u2013 SPLIT TYPE \u2013 CASSETTE TYPE ; 2014<\/li>\n<li><strong>AJINOMOTO CO., (THAILAND) LTD. PATHUMTHANI FACTO<\/strong>RY : INSTALLATION OF AIR CONDITONING SYTEM WITH DUCT WORK ; 2014<\/li>\n<li><strong>PREECHA COMPLEX<\/strong> : REPLACEMENT OF FIRE PUMP WITH INSTALLATION AND COMMISSIONING SYSTEM ; 2014<\/li>\n<li><strong>ASAWANN COMUNITYMALL SAMSE<\/strong>N : RENOVATION OF AIR CONDITONING SYTEM ; 2014<\/li>\n<li><strong>TDK (THAILAND)<\/strong> : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2014<\/li>\n<li><strong>ASAWANN SHOPING COMPLEX 2 NONGKHAI<\/strong> : INSTALLATION OF AIR CONDITONING SYTEM \u2013 VSD SCREW AIR COOLED CHILLER PLANT 450 TR x 1 SET, 250 TR x 2 SETS, AHU&amp;FCU AND FIRE FIGHTING SYSTEM ; 2014<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF PPR PIPE ON 2<sup>ND<\/sup> FLOOR, BUILDING 1 ; 2014<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF PPR PIPE ON 11<sup>th<\/sup> FLOOR, BUILDING 1 ; 2014<\/li>\n<li><strong>CENTRAL PINKLAO<\/strong> : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2014<\/li>\n<li><strong>AJINOMOTO CO., (THAILAND) LTD. PATHUMTHANI FACTORY<\/strong> : INSTALLATION OF AIR CONDITONING SYTEM FOR PACKING ROOM ; 2014<\/li>\n<li><strong>PHYATHAI 1 HOSPITAL<\/strong> : REINSULATE CHILLED WATER PIPE FOR CORRIDOR WARD 6A ; 2014<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF PPR PIPE FROM CHILLER PLANT TO COOLING TOWER, BUILDING 4 ; 2014<\/li>\n<li><strong>AMBASSADOR JOMTIEN PATTAYA<\/strong> : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 3 SETS UNDER AUTHORIZED BY JCI ; 2014<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF AHU FOR CORRIDOR ON 7<sup>th<\/sup> FLOOR, BUILDING 4 ; 2015<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF FCU FOR EXECUTIVE ROOM ON MC FLOOR, BUILDING 1 ; 2015<\/li>\n<li><strong>AIKCHOL 1 &amp; 2 HOSPITAL<\/strong> : REPLACEMENT OF AIR COOLED CHILLER 5 SETS UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF AHU FOR DATA CENTER ROOM ON 12<sup>th<\/sup> FLOOR, BUILDING 1 ; 2015<\/li>\n<li><strong>AIKCHOL 2 HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR MALE PATIENT ROOM ON 3<sup>rd<\/sup> FLOOR AND ADMIN. BLD. ON 4<sup>th<\/sup> FLOOR UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : REPLACEMENT OF WATER COOLED CHILLER 700 TR UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>AIKCHOL 1 HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR MATERNITY WARD ON 2<sup>nd<\/sup> FLOOR UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTH<\/strong>IN : RENOVATION OF CW PIPE ON 3<sup>rd<\/sup> FLOOR, BUILDING 1 ; 2015<\/li>\n<li><strong>UOB @SATHON BUILDING<\/strong> : REPLACE ALL AHU\u2019S MONITORING EQUIPMENT IN ROBOT BUILDING ; 2015<\/li>\n<li><strong>AIKCHOL 1 HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR BUILDING 1 &amp; 2 UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS)<\/strong> : REPLACEMENT OF AC SYSTEM ON FLOOR G &amp; 1 ; 2015<\/li>\n<li><strong>AIKCHOL 1 HOSPITAL<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR ICU NEGATIVE PRESSURE, POSITIVE PRESSURE.&amp; STERILE ROOM UNDER AUTHORIZED BY JCI ; 2015<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AHU 20 TR 6 SETS FOR PRINTING ROOM CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUST DUCT SYSTEM IN AZ-PERSO ROOM (PHRAPRADAENG PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REINSULATING OF CHILLED WATER PIPE FOR DATA PREP SB CARD 3 ROOM (PHRAPRADAENG PLANT) ; 2016<\/li>\n<li><strong>CENTRAL CHONBURI<\/strong> : REINSULATING OF CHILLED WATER PIPE ; 2016<\/li>\n<li><strong>ASAWANN PHONPHISAI<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM AND FIRE FIGHTING SYSTEM ; 2016<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : RENOVATION OF AIR CONDTIONING SYSTEM FOR ORTHO BUILDING 3 ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUST SYSTEM FOR MIYAKOSHI (PHRAPRADAENG PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF EXHAUST FAN &amp; MC.PP, CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING ROOM CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM FOR GSD &amp; PB (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF WATER COOLED CHILLER 500 TR (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF PPR PIPE ON 3<sup>rd<\/sup> &amp; 4<sup>th<\/sup> FLOOR, BUILDING 1 ; 2016<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : REPLACEMENT OF CONDESER WATER PUMP ; 2016<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : RENOVATION OF HVAC SYSTEM CAPEX ; 2016<\/li>\n<li><strong>BIOLAB, BANGPOO INDUSTRAIL ESTATE<\/strong> : REPLACEMENT OF MONITORING EQUIPMENT FOR AHU 1-6 WHR ; 2016<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM FOR BUILDING A &amp; B (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING ROOM CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>SIAM RUBBER CO., LTD<\/strong> : INSTALLATION OF TEMPERATURE AND HUMIDITY CONTROL AHU FOR WAREHOUSE 3-5, VMI BUILDING PHASE 2 ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF CHILLED WATER PIPE FOR CD74-04 TO CD74-03 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>THE NATIONAL LIBRARY OF THAILAND<\/strong> : REPAIRING OF AIR COOLED CHILLER \u201cYORK\u201d MODEL-YCIV1000SA50VA 2 SETS ; 2017<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : REPLACEMENT OF CONDESER WATER PUMP \u2013 CDP NO.2 ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING MACHINE CD74-04 AND INK MIXING (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF COMPRESSED AIR PIPE FOR CSK2-CSK3 AND PP ROOM-CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR FLEXIBLE PACKAGING &#8211; SCC (PHRAPRADAENG PLANT) ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR AZ SB CARD 2<sup>nd<\/sup> FLOOR (PHRAPRADAENG PLANT) ; 2017<\/li>\n<li><strong>HOTEL MANHATTAN SUKHUMVIT BANGK<\/strong>OK : INSTALLATION OF OIL FREE MAGNETIC BEARING CHILLER 250 TR AND NEW CHILLER ROOM ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF VENTILATION SYSTEM FOR MOD PP (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LT<\/strong>D : INSTALLATION OF FCU AND RELOCATE AHU FOR LASER PERFORATING MACHINE \u2013 CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2018<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : REPLACEMENT OF CONDESER WATER PUMP \u2013 CDP NO.1 ; 2018<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING C<\/strong>O., LTD : INSTALLATION OF SPIRAL EXHAUST DUCT FOR UV INKJET M\/C NILPETER 01 LABEL-CSR (SUKSAWAD PLANT) ; 2018<\/li>\n<li><strong>MAJOR CINEPLEX \u2013 ASWANN 1<\/strong> : INSTALLATION OF AIR CONDITIONING AND FIRE FIGHTING SYSTEM ; 2018<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF COOLING COIL AHU NO. 11 AND 12 5<sup>th<\/sup> FLOOR ; 2018<\/li>\n<li><strong>JIENG FUTURE PLAZA \u2013 ASWANN 1<\/strong> : REPLACEMENT OF AIR HANDLING UNIT 40 TR X 4 SETS ; 2018<\/li>\n<li><strong>THE NATIONAL BROADCASTING SERVICES OF THAILAND<\/strong> : REPLACEMENT OF CONDENSER COIL FOR AIR COOLED CHILLER NO. 1 SYSTEM #2 ; 2018<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : INSTALLATION OF FIRE BARRIER FOR ELECTRICAL SHAFT ; 2018<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : RENOVATE OF EXHAUST DUCT FOR FOOD COURT 2<sup>nd<\/sup> FLOOR ; 2018<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF CW-STEEL GALVANIZED PIPE ON BASEMENT 3 FLOOR ; 2018<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : INSTALLATION OF AIR CONDITION FOR OFFICE (B) 366.5 SQ.MM BASEMENT 1 FLOOR ; 2018<\/li>\n<li><strong>CENTRAL RAMA<\/strong> 9 : INSTALLATION OF MECHANICAL AND ELECTRICAL FOR SHOP 204 ; 2018<\/li>\n<li><strong>CENTRAL RAMINDRA<\/strong> : RENOVATION OF VENTILATION SYSTEM FOR CAR PARK ; 2018<\/li>\n<li><strong>ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS)<\/strong> : AIR CONDITIONING SYSTEM FOR RAW BEDDING ROOM ; 2018<\/li>\n<li><strong>FB BATTERY FACTORY<\/strong> : INSTALLATION OF CHILLER PLANT FOR CHARGER ROOM ; 2019<\/li>\n<li><strong>ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS)<\/strong> : REPLACEMENT OF COMPRESSOR FOR AC SYSTEM ; 2019<\/li>\n<li><strong>ELITE KRAFT PAPER-HEAD OFFICE<\/strong> : RENOVATION OF CHILLER FOR AIR CONDITIONING SYSTEM ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : REPLACEMENT OF AIR CONDITION FOR K BANK 1<sup>ST<\/sup> FLOOR ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : REPLACEMENT OF AIR CONDITION FOR DISCOVERY BOOK STORE ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : INSTALLATION OF AUTOMATIC SPRINKLER OF FIRE PROTECTION SYSTEM FOR CAR PARK 1<sup>ST<\/sup> FLOOR BANGKOK OFFICE 4 ; 2019<\/li>\n<li><strong>SIAM RUBBER<\/strong> : INSTALLATION OF COOLING TOWER PLANT FOR MACHINE COOLING PROCESS ; 2019<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : INSTALLATION OF AHU FOR CHILLER PLANT &amp; ELECTRICAL ROOM ; 2019<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : INSTALLATION OF AHU 14<sup>TH<\/sup> FLOOR, BUILDING 1 ; 2019<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : RELOCATE AHU FOR PRESS ROOM \u2013 CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2019<\/li>\n<li><strong>HOTEL MANHATTAN SUKHUMVIT BANGKOK<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM FOR 200 HOTEL ROOMS ; 2019<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF COMPRESSED AIR PIPE FOR \u2013 CSK5\/1 AND CSK5\/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : REPLACEMENT OF AIR CONDITION FOR ADECCO ON 11<sup>TH<\/sup> FLOOR ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : INSTALLATION OF PACKAGE WATER COOLED AIR CONDITIONER FOR UNIT 2 (604 SQ.M) B1 FLOOR ; 2019<\/li>\n<li><strong>FB BATTERY FACTORY<\/strong> : INSTALLATION OF AIR HANDLING UNIT FOR EXISTING CHARGER ROOM ; 2019<\/li>\n<li><strong>PAOLO MEMORIAL PHAHOLYOTHIN<\/strong> : REPLACEMENT OF MOTORIZED BUTTERFLY VALVES ; 2019<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF CHILLED WATER COIL FOR AHU NO.9 AND 10 ON 5<sup>TH<\/sup> FLOOR ; 2019<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : RENOVATION OF AIR CONDITIONING AND VENTILATION SYSTEM FOR LVMH ON 16<sup>TH<\/sup> FLOOR ; 2019<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF 2 WAY CONTROL VALVE FOR AHU ON 2<sup>ND<\/sup> FLOOR AND 5<sup>TH<\/sup> FLOOR ; 2019<\/li>\n<li><strong>THE INSTITUTE OF PUBLIC RELATION<\/strong> : REPAIRING OF CHILLED WATER PUMP AND ACCESSORIES ; 2019<\/li>\n<li><strong>AMAZON PAPYRUS<\/strong> : INSTALLATION OF ELECTRICAL SYSTEM, STRUCTURE AND INTERIOR WORK FOR OFFICE ; 2019<\/li>\n<li><strong>PAOLO RANGSIT HOSPITAL<\/strong> : INSTALLATION OF EXHAUST FAN FOR WASTE WATER TREATMENT ROOM ; 2019<\/li>\n<li><strong>PAOLO RANGSIT HOSPITAL<\/strong> : INSTALLATION OF FAN COIL UNIT FOR OR 3<sup>RD<\/sup> FLOOR ; 2019<\/li>\n<li>ITAL THAI TOWER : REPLACEMENT OF AIR HANDLING UNIT ON 18<sup>TH<\/sup> FLOOR ; 2019<\/li>\n<li><strong>PAOLO RANGSIT HOSPITAL<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM FOR ELECTRICAL ROOM ON 8<sup>TH<\/sup> FLOOR, UPS ROOM ON OR 3<sup>RD<\/sup> FLOOR AND VENTILATION SYSTEM FOR TREATMENT ROOM ON B1 FLOOR ; 2019<\/li>\n<li><strong>CHAMCHURI SQUARE<\/strong> : INSTALLATION OF AIR HANDLING UNIT AND FAN COIL UNIT ON 11<sup>TH<\/sup> FLOOR ; 2020<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : REPLACEMENT OF AIR HANDLING UNIT No.16-03 FOR LVMH OFFICE ON 16<sup>TH<\/sup> FLOOR ; 2020<\/li>\n<li><strong>PHRA NAKHON SI AYUTTHAYA HOSPITAL<\/strong> : RENOVATION OF OR-OPERATION ROOM No.2 AND 3 ; 2020<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF WATER COOLED CHILLER 1000 TR AND COMBINED CHILLED WATER PIPE FOR CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020<\/li>\n<li><strong>THE INSTITUTE OF PUBLIC RELATION<\/strong> : REPLACEMENT OF COLD WATER PIPE AND ACCESSORIES ON 1<sup>ST<\/sup> FLOOR ; 2020<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF COMPRESSED AIR PIPE FOR CLEAN ROOM FULFILLMENT 3 AT CSK5\/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : INSTALLATION OF AIR CONDITIONING SYSTEM FOR CLEAN ROOM FULFILLMENT 3 AT CSK5\/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020<\/li>\n<li><strong>PHYATHAI NAWAMIN HOSPITAL<\/strong> : REPLACEMENT OF BUTTERFLY VALVE FOR COOLINRG TOWER PLANT ; 2020<\/li>\n<li><strong>UOB BANK, PHET KASEM<\/strong> : RENOVATION OF SPRING ISOLATOR SUPPORT FOR CHILLER PUMP BUILDING A AND C ; 2020<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF KW PIPE SUS304 FOR SHABUSHI ; 2020<\/li>\n<li><strong>THE INSTITUTE OF PUBLIC RELATION<\/strong> : REPAIRING OF AIR HANDLING UNIT AND FAN COIL UNIT ; 2021<\/li>\n<li>SALEE PRINTING PCL. : RENOVATION OF CHILLER PLANT WITH HYBRID AIR COOLED CHILLER ; 2021<\/li>\n<li><strong>NSK ASIA PACIFIC TECHNOLOGY CENTRE (THAILAND) COMPANY LIMITED<\/strong> : RENOVATION OF AIR CONDITIONING SYSTEM (VRF &#8211; VARIABLE REFRIGERANT FLOW) AND ELECTRICAL SYSTEM ; 2021<\/li>\n<li><strong>THE PUBLIC RELATIONS DEPARTMENT<\/strong> : RENOVATION OF AIR CONDITONING SYSTEM (CHILLER PLANT AND ALL EQUIPMENT) FOR RAMA VI HEAD OFFICE ; 2021<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF COLD WATER PIPE ON 31<sup>th<\/sup> FLOOR ; 2021<\/li>\n<li><strong>CENTRAL WORLD<\/strong> : REPLACEMENT OF COLD WATER PIPE ON GROUND FLOOR ; 2021<\/li>\n<li><strong>CHANWANISH SECURITY PRINTING CO., LTD<\/strong> : REPLACEMENT OF DUCT\u2019S INSULATION FOR S\/B 1 AND S\/B 2 ON 3<sup>rd<\/sup> FLOOR (PHRAPRADAENG PLANT) ; 2021<\/li>\n<li><strong>ASAWANN \u2013 SHOPPING COMPLEX 2 (NONGKHAI)<\/strong> : REPLACEMENT OF CONDENSER COIL FOR AIR COOLED CHILLER NO. 1, 2 AND 3 (400 TRx1 SET AND 250 TRx2 SETS ; 2021<\/li>\n<li><strong>UDONTHANI HOSPITAL<\/strong> : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE AT EXCELLENCE CENTER BUILDING ; 2021<\/li>\n<li><strong>EGAT \u2013 BANGPAKONG TRAINING CENTER<\/strong> : REPLACEMNT OF AIR COOLED CHILLERS AND CHILLED WATER PUMPS ; 2021<\/li>\n<li><strong>QUEEN SIRIKIT HOSPITAL<\/strong> : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE ; 2021<\/li>\n<li><strong>THE GOLDEN JUBILEE MEDICAL CENTER<\/strong> : REPLACEMENT OF AIR HANDLING UNIT 6 SETS ; 2021<\/li>\n<li><strong>ITAL THAI TOWER<\/strong> : INSTALLATION OF AUTOMATIC SPRINKLER OF FIRE PROTECTION SYSTEM FOR LPG STORAGE FACILITY ; 2021<\/li>\n<li><strong>THE GOLDEN JUBILEE MEDICAL CENTER<\/strong> : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE ; 2021<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>THE ORIENTAL HOTEL : INSTALLATION OF MAKE-UP WATER SYSTEM AND SANITARY SYSTEM WITH CONTROL EQUIPMENT ; 2002 THE ORIENTAL HOTEL : INSTALLATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM (ADDITIONAL); 2002 THONBURI ENTERTAINMENT COMPLEX : REPAIRTION AND RENOVATION OF AIR CONDITIONING SYSTEM AND COOLING TOWER; 2003 JIENG FUTURE PLAZA. NONGKHAI PROVINCE : INSTALLATIN OF [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-17","post","type-post","status-publish","format-standard","hentry","category-job-reference"],"_links":{"self":[{"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/posts\/17","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/comments?post=17"}],"version-history":[{"count":9,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/posts\/17\/revisions"}],"predecessor-version":[{"id":118,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/posts\/17\/revisions\/118"}],"wp:attachment":[{"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/media?parent=17"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/categories?post=17"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tes-thai.com\/index.php\/wp-json\/wp\/v2\/tags?post=17"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}