MECHANICAL WORK

MECHANICAL WORK

  • THE ORIENTAL HOTEL : INSTALLATION OF MAKE-UP WATER SYSTEM AND SANITARY SYSTEM WITH CONTROL EQUIPMENT ; 2002
  • THE ORIENTAL HOTEL : INSTALLATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM (ADDITIONAL); 2002
  • THONBURI ENTERTAINMENT COMPLEX : REPAIRTION AND RENOVATION OF AIR CONDITIONING SYSTEM AND COOLING TOWER; 2003
  • JIENG FUTURE PLAZA. NONGKHAI PROVINCE : INSTALLATIN OF AIR VENTILATION; 2003
  • CHAN WANICH SECURITY PRINTING CO., LTD. : INSTALLATION OF AIR CONDITIONING SYSTEM; 2003
  • CHAOPHRAYA PARK HOTEL : PROCUREMENT OF AIR CONDITIONING ACCESSORIES AND HEATING EQUIPMENT; 2003
  • JIRATIP VILLAGE (PHASE SOI WATCHARAPHOL) : PROCUREMENT AND INSTALLATION SPLIT TYPE UNIT 35 SETS; 2003
  • PHRAYATHAI 3 HOSPITAL : RENOVATION OF COOLING TOWER 1000 RT, 4 UNITS; 2003
  • CHALERMTHAI SHOPPING MALL (CHONBURI) : RENOVATION OF COOLING TOWER 350 RT, 4 UNITS; 2003
  • PACIFIC PARK (SRIRACHA, CHONBURI) : INSTALLATION OF SUPPLY AIR DUCT AND VENTILATION SYSTEM; 2003
  • ORIENTAL HOTEL : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR SAND FILTER TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2003
  • ORIENTAL HOTEL : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR ROOF TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2004
  • ONE TWO SING (SILOM RD.), ENTERTAINMENT COMPLEX : PURCHASING AND INSTALLATION WORK OF SPLIT TYPE UNIT AMOUNT 31 SETS; 2004
  • NARAI HOTEL : PURCHASING AND INSTALLATION WORK OF CIRCULATING WATER PUMP FOR CHILLER WATER SYSTEM AMOUT 6 SETS; 2004
  • TETRAPAK (THAI) : PURCHASING AND INSTALLATION WORK OF WATER COOLED CHILLER 200 TR WITH ACCESSORIES 1 UNIT; 2004
  • UTILITY BUSINESS ALLIANCE (NONG-KHAM, WATER TREATMENT PLANT) : PURCAHASING SYNTHETIC FILTER FOR AIR CONDITIONING SYSTEM; 2004
  • THAI NOK (AMATA CITY, CHOLBURI PLANT) : INSTALLATION WORK OF AIR COOLED CHILLER WITH EQUIPMENT AND ACCESSORIES; 2004
  • SIAM JUSCO, RUJCHADAPISEK BRANCH : RENOVATION OF AIR CONDITIONING SYSTEM ; 2004
  • Johnson & Johnson : DESIGN AND INSTALLATION WORK OF HEAT EXCHANGER FOR COOLING AIR COMPRESSOR SYSTEM; 2004
  • SILOM COMPLEX : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004
  • TETRAPAK (THAI) : PURCHASING AND INSTALLATION WORK OF CONDENSER WATER PUMP WITH PIPING AND ACCESSORIES 1 UNIT; 2004
  • GRAND HYATT ERAWAN : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004
  • BANK OF AYUDHYA, RAMA III HEAD OFFICE : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR TRAINING CENTER ON 16th FL; 2004
  • BANK OF AYUDHYA, RAMA III HEAD OFFICE : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR FOREIGN BANKNOTE ON BASEMENT 1; 2005
  • HI-MALL, (MACKRO) BANGKABUE : CONSULTANT OF ENGINEERING SYSTEM; 2005
  • MUANG-THAI LIFE ASSURANCE BUILDING (RAJCHADAPISEK RD.), HEAD OFFICE : RENOVATION WORK OF TRAINGING CENTER 12th FL; 2005
  • WYNCOAST INDUSTRIAL PARK (PUBLIC) CO., LTD., FACTORY AT BANPAKONG, CHACHEANGSAO : RENOVATION OF AIR CONDITIONING SYSTEM; 2005
  • TETRAPAK (THAI) : RENOVATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005
  • MISTER DONUT, HI-MALL, (MACKRO) BANGKABUE : INSTALATION OF MAIN SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005
  • TETRAPAK (THAI) : RENOVATION OF AIR CONDITIONING SYSTEM; 2006
  • PANYA ELECTRONICS BUILDING : INSTALLATION OF 18 SETS OF SPLIT TYPE ; 2006
  • SARABURI HOSPITAL : RENOVATION OF AIR CONDITIONING 1ST & 2ND FLOOR ; 2006
  • BANK OF AYUDHYA, PLOEN-JIT BRANCH : RENOVATION WORK OF INSULATING FOR CHILLED WATER PIPIPING ; 2006
  • RAWIWARIN RESORT : INSTALLATION OF AIR CONDITIONING FOR YACHT
  • UOB BANK : INSTALLATION OF AIR CONDITIONING FOR CONTROL ROOM ; 2006
  • CENTRAL-BIG C, HUA-MAK BRANCH : RENOVATION OF AIR CONDITIONING ; 2006
  • NARAI HOTEL : REPAIR WORK OF AIR CONDITIONING SYSTEM AT CORIDOOR OF RATANAKOSIN BALL ROOM ; 2007
  • JIENG FUTURE PLAZA, NONG-KHAI : INSTALLATION OF AIR CONDITIONING & FIRE FIGHTING SYSTEM ; 2007
  • BUPA CROSS : RENOVATION OF AIR CONDITIONING FOR SERVER ROOM ; 2007
  • ROYAL GARDEN PLAZA : INSTALLATION OF AIR DUCT FOR AIR CONDITIONING SYSTEM ; 2007
  • TEIJIN, THAILAND : INSTALLATION OF HIGH VOLTAGE WATER COOLEDCHILLER ; 2007
  • THAI LIFE ASSURANCE, TAIKISHA : REPLACEMENT COMPRESSOR OF WATER COOLED PACKAGED ; 2007
  • UOB : RENOVATE CHILLED WATER SYSTEM ; 2007
  • UOB : RENOVATE CHILLED WATER SYSTEM ; 2007
  • NARAI HOTEL : REPAIR CONDENSER WATER PUMP #2 ; 2007
  • NARAI HOTEL : REPAIR CHILLED WATER PUMP #2 ; 2007
  • NARAI HOTEL : REPAIR CHILLED WATER PUMP #3 ; 2007
  • NARAI HOTEL : REPAIR CHILLED WATER PUMP #3 222 BUILDING ; 2007
  • BANK OF AYUDHYA, PLEONJIT : INSTALLATION OF WATER COOLED CHILLER 425 TR ; 2007
  • UOB : RENOVATE CHILLED WATER SYSTEM ; 2007
  • CHANWANISH SECURITY PRINTING : INSTALLATION OF AHU 20TR x 4SETS (BIG BOX) ; 2008
  • UOB : REPAIR AIR CONDITION 19 FLOOR, ROBOT BUILDING ; 2008
  • CHANWANISH SECURITY PRINTING : 10 TR PACKAGED AIR RENTAL FOR BIG BOX ; 2008
  • TETRAPAK (THAI) : REPAIR LEAKAGED OF CHILLER NO. 2 & 3 ; 2008
  • UOB (AYUDHYA) : REPAIR AHU ; 2008
  • UOB (SUKHUMWIT 26) : SECURITY ROOM ; 2008
  • UOB : INSTALLATION OF AIR CONDITION FOR COUNTER SERVICE /RO ; 2008
  • UOB : REPAIR AIR CONDITIN FOR MOBILE CAR ; 2008
  • UOB : RENOVATION OF SUPPLY AIR DUCT, SERVER ROOM 7 FLOOR, ROBOT BUILDING ; 2008
  • CHANWANISH SECURITY PRINTING CO., LTD : PACKAGED AIR RENTAL ; 2008
  • UOB : REPAIR AIR CONDITIN FOR UPS1000K ROOM ; 2008
  • NARAI HOTEL : REPAIR CONDENSER WATER PUMP #1 ; 2008
  • UOB : INSTALL CHILLED WATER PIPE IN STRONG ROOM ; 2008
  • UOB : REPAIR AIR CONDITION SERVER ROOM, 7 FLOOR ; 2008
  • TETRAPAK (THAI) : REPAIR CHILLER NO.1 (RCU 80 wx) ; 2008
  • MUANG-THAI LIFE ASSURANCE BUILDING (RAJCHADAPISEK RD.), HEAD OFFICE : RENOVATION WORK OF WATER COOLED PACKAGED AIR CONDITION FOR MUANG THAI LIFE ASSURANCE AUDITORIUM ; 2008
  • TETRAPAK (THAI) : REPAIR CHILLER 2 (RCU  240 wx) ; 2008
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AIR CONDITIONING SYSTEM FOR WAREHOUSE AT SINSAKORN PLANT ; 2008
  • UOB : REPAIR AIR CONDITION , 19 FLOOR ; 2008
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALL AIR CONDITION FOR SERVER ROOM 2nd FLOOR ; 2008
  • RAYONG ENGINEERING AND PLANT SERVICE CO.,LTD. (REPCO) : RENOVATION OF OFFICE VENTILATION ; 2008
  • TETRAPAK (THAI) : AIR COOLED CHILLER 100 TR RENTAL ; 2008
  • NARAI HOTEL : REPAIR MOTOR CONDENSER WATER PUMP #3 ; 2008
  • NARAI HOTEL : REPAIR SPARE MOTOR ; 2008
  • CHANWANISH SECURITY PRINTING CO., LTD : AIR COOLED CHILLER RENTAL ; 2008
  • UOB : INSTALL MOTORIZED CONTROL VALVE, SOFTWARE PARK BRANCH ; 2008
  • UOB : INSTALL COMPRESSOR FOR COUNTER SERVICE ROOM, ROBOT BUILDING ; 2008
  • TETRAPAK (THAI) : REPLACE PLATE HEAT EXCHANGE FOR CHILLER NO. 1 & 2 ; 2008
  • UOB : RENOVATE AHU 11th FLOOR (AHU11B) ; 2009
  • UOB : RENOVATE Fresh & Exhaust Air, SUKHUMWIT 26 BRANCH ; 2009
  • UOB : INSTALLATION OF AIR CLEANNER AT BASEMENT FLOOR, SUKHUMWIT 26 BRANCH ; 2009
  • SIAM TOPPAN PACKAGING CO.,LTD : AUDIT CHILLER EFFICIENCY ; 2009
  • TETRAPAK (THAI) : REPLACE COMPRESSOR FOR TELEPHONE ROOM 1st FLOOR ; 2009
  • UOB : INSTALLATION OF AIR CONDITION FOR MAILING ROOM ; 2009
  • TETRAPAK (THAI) : REPLACE COMPRESSOR FOR SERVER ROOM 3rd FLOOR ; 2009
  • BUPA HEALTH INSURANCE (THAILAND) : REPLACE COMPRESSOR ; 2009
  • UOB : ULTRA SONIC FLOW MEASUREMENTFOR AHU AT BASEMENT & GROUND FLOOR, SUKHUMWIT 26 BRANCH ; 2009
  • UOB : RENOVATE AIR CONDITION FOR GOOD WOOD BUILDING, 5th FLOOR ; 2009
  • TETRAPAK (THAI) : RENOVATE COOLING TOWER ; 2009
  • UOB : RENOVATE AIR CONDITION FOR SERVER ROOM, 7th FLOOR ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF WATER COOLED CHILLER PLANT FOR SINSAKORN PLANT ; 2009
  • WISMA ASIA : INSTALLATION OF WATER COOLED AIR CONDITION FOR SERVER ROOM, HEAD OFFICE ; 2009
  • PATHUMWAN PRINCESS HOTEL BANGKOK : REPLACE COMPRESSOR FOR AIR CONDITION, 6th FLOOR ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AHU FOR AFTER PRESS PROJECT (PHRAPRADAENG PLANT) ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : REPAIR AIR CONDITION FOR THANACHART-WONGSAWANG BRANCH ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF FIRE FIGHTING PIPELINE IN TRENCH FOR SINSAKORN PLANT ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUT AIR SYSTEM FOR CTP ROOM (PHRAPRADAENG PLANT) ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUT AIR SYSTEM FOR ARTWORK ROOM (PHRAPRADAENG PLANT) ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUT AIR SYSTEM FOR PERSO ROOM (PHRAPRADAENG PLANT) ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUT AIR SYSTEM FOR SM52 (PHRAPRADAENG PLANT) ; 2009
  • UOB : INSTALLATION OF AIR CLEANER FOR COUNTER SERVICE 1 ; 2009
  • TETRAPAK (THAI) : REPAIR BREAK DOWN AHU 3/2 ; 2009
  • NARAI HOTEL : REPAIR MOTOR, CDP NO. 2 ; 2009
  • UOB : REPAIR AIR CONDITON FOR MAILING ROOM, SATORN BUILDING ; 2009
  • SKYY HOTEL, SUKHUMVIT : INSTALLATION OF VRF ; 2009
  • NATIONAL LIBRARY OF THAILAND : INSTALLATION OF AIR CONDITONING SYSTEM UNDER AUTHORIZED BY JCI ; 2009
  • TETRAPAK (THAI) : REPAIR CO-WATER PUMP (PRESSURE TUBE) ; 2009
  • CHANWANISH SECURITY PRINTING CO., LTD : REMOVE & INSTALLATION OF VENTILATION SYSTEM FOR INDIGO (PHRAPRADAENG PLANT) ; 2009
  • NARAI HOTEL : OVERHAUL SPARE MOTOR, CHP ; 2010
  • NARAI HOTEL : OVERHAUL MOTOR, CHP NO.2 ; 2010
  • CHANWANISH SECURITY PRINTING CO., LTD : REPAIR AIR CONDITION, BH96YGAT (PHRAPRADAENG PLANT) ; 2010
  • TETRAPAK (THAI) : REPAIR AIR CONDITION FOR ENGINEERING ROOM, 1st FLOOR ; 2010
  • TETRAPAK (THAI) : REPAIR EXHAUST FAN, ROOF FLOOR ; 2010
  • SKYY HOTEL, SUKHUMVIT : INSTALLATION OF VENTILATION SYSTEM ; 2010
  • TETRAPAK (THAI) : SITE SURVEY WATER PLUMBING ; 2010
  • UOB : REMOVE AIR CONDITION SYSTEM AND INSTLL FROM MUANGTHONG BRANCH TO SUKHUMVIT 26 BRANCH ; 2010
  • TETRAPAK (THAI) : RENOVATE AHU 3/3 ; 2010
  • PTT HEAD OFFICE : INSTALLATION OF AIR CONDITIONING SYSTEM UNDER AUTHORIZED BY JCI ; 2010
  • GRAND HYATT ERAWAN : BREAKDOWN CW PIPING ; 2010
  • DATA PRODUCT TOPPAN FORMS : RENOVATION OF CHILLER PLANT AIR COOLED TO WATER COOLED UNDER AUTHORIZED BY JCI ; 2010
  • BUPA HEALTH INSURANCE (THAILAND) : REPAIR OF CONDENSING UNIT ; 2010
  • TETRAPAK (THAI) : AIR COOLED CHILLER 200 TR RENTAL ; 2010
  • TETRAPAK (THAI) : REPLACE DRAINAGE PUMP OF AIR CONDITION ; 2010
  • PAOLO MEMORIAL NAWAMIN : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 3 ; 2010
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT 500 TR x 2 SETS WATER COOLED CHILLER, BUILDING 1 ; 2010
  • PHYATHAI 1 HOSPITAL : INSTALLATION OF AIR CONDITION ; 2010
  • Narai Hotel : REPAIR CONDENSER PUMP NO. 3 & CHILLED WATER PUMP NO. 3 ; 2010
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AIR CONDITION (PHRAPRADAENG PLANT) ; 2010
  • CHANWANISH SECURITY PRINTING CO., LTD : REPAIR AIR CONDITION, BH96YGAT (PHRAPRADAENG PLANT) ; 2010
  • PAOLO MEMORIAL NAWAMIN : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 2 ; 2011
  • PHYATHAI 1 HOSPITAL : INSTALLATION OF AIR CONDITION ; 2011
  • BUPA HEALTH INSURANCE (THAILAND) : INSTALLATION OF AIR CONDITION ; 2011
  • CHANWANISH SECURITY PRINTING CO., LTD : REPAIR CHILLED WATER PUMP NO.1 FOR SINSAKORN PLANT ; 2011
  • PHYATHAI 1 HOSPITAL : INSTALLATION OF AIR CONDITION FOR MARKETING ROOM ; 2011
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALL BALANCING VALVE FOR CHILLER NO.2, BUILDING 4 ; 2011
  • JOHNSONS & JOHNSONS : CLEANING PLATE HEAT EXCHANGER ; 2011
  • BANK OF AYUDHYA – PLOENJIT BRANCH : REPLACEMENT OF 425 TR WATER COOLED CHILLER UNDER AUTHORIZED BY JCI ; 2011
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF BUTTERFLY VALVE FOR HVAC PIPE, BUILDING 1 ; 2011
  • PHYATHAI 1 HOSPITAL : INSTALLATON OF AIR CONDITION ; 2011
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AHU 10 TR x 4 SETS FOR BIG BOX (PHRAPRADAENG PLANT) ; 2011
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF AIR HANDLING UNIT FOR RESTAURANT 2ND FLOOR, BUILDING 1 ; 2011
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AC FOR CONTROL ROOM (PHRAPRADAENG PLANT) ; 2011
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF AIR HANDLING UNIT FOR INPATIENT DEPARTMENT(IPD) LOBBY 2ND FLOOR, BUILDING 1 ; 2011
  • UOB : RENOVATE CW PIPE SUKHUMVIT 26 BRANCH ; 2011
  • PAOLO MEMORIAL NAWAMIN : REPLACEMENT 450 TR WATER COOLED CHILLER NO. 1 ; 2012
  • UOB : RENOVATE TRANSFER AIR GRILLE SUKHUMVIT 26 BRANCH ; 2012
  • CHILDREN HOSPITAL : RENOVATE AIR CONDITIONING FOR EXAMINATION ROOM 3rd FLOOR ; 2012
  • PHYATHAI 3 HOSPITAL : REPLACEMENT OF CHILLED WATER PUMP ; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF AIR CONDITION FOR ENTERAL FEEDING ROOM 11th FLOOR, INTERVIEW ROOM 12th FLOOR, CONFERRENCE ROOM 11A & 11B, BUILDING 1 ; 2012
  • CHILDREN HOSPITAL : REPLACEMENT OF AIR CONDITIONING FOR BIOCHEMICAL LABORATORY 5th FLOOR ; 2012
  • UOB : REPLACEMENT CHEMICAL FEED TANK FOR CHILLER PLANT HEAD OFFICE, ROBOT BUILDING, SATHORN ROAD; 2012
  • CENTRAL PATTANA PUBLIC COMPANY LIMITED (CPN) : REPLACEMENT OF MAIN SOIL PIPE, CENTRAL RAMA 3; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : RENOVATE OF AIR CONDITION FOR DOCUMENT STORAGE ROOM, BUILDING 1 ; 2012
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AC FOR GROSS 3 (PHRAPRADAENG PLANT) ; 2012
  • DON MUEANG INTERNATIONAL AIRPORT : INSTALLATION OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2012
  • SHELL, RAMA 9 STATION : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012
  • UOB : WATER PIPE LEAK FIXXING AT PARKING LOT, HEAD OFFICE, ROBOT BUILDING, SATHORN ROAD; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF EXPANSION TANK FOR CHILLER PLANT, BUILDING 4 ; 2012
  • CHANWANISH SECURITY PRINTING CO., LTD : MODIFY HEADER OF CHILLED WATER PIPE IN CHILLER PLANT (PHRAPRADAENG PLANT) ; 2012
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF PNEUMATIC PIPE FOR CMC ROOM (PHRAPRADAENG PLANT) ; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF FIRE BARRIER IN SYSTEM SHAFT, BUILDING 1 ; 2012
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF CHILLED WATER AIR CONDITIONING FOR CMC ROOM (PHRAPRADAENG PLANT) ; 2012
  • T.S. ENGINEERING (2004) CO., LTD. : INSTALLATION OF VARIABLE REFRIGERANT FLOW (VRF) FOR HEAD OFFICE ; 2012
  • SHELL, BANGCHALONG STATION, SAMUTPRAKARN : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012
  • MICHELIN SIAM (NKE) : INSTALLATION AIR HANDLING UNIT 50 TR x 2 SETS FOR RETREAD AV ; 2012
  • PAOLO MEMORIAL NAWAMIN : OVERHAUL CHILLED WATER PUMP # 3 ; 2012
  • CHILDREN HOSPITAL : REPLACEMENT OF AIR CONDITIONING FOR ISOLATION ROOM 4th FLOOR ; 2012
  • SHELL, C.R.P. PETROLEUM LTD. STATION, CHONBURI : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2012
  • LE MERIDIEN BANGKOK : INSTALLATION OF VENTILATION FAN FOR CAR PARKING ; 2012
  • WISMA ASIA : INSTALLATION OF AIR CONDITIONING FOR SERVER ROOM ; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF PRESSURE RELIEF VALVE FOR CHILLED WATER SYSTEM, BUILDING 1 ; 2012
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF FIRE BARRIER SYSTEM, BUILDING 1 ; 2013
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF CHILLER PLANT MANAGEMENT SYSTEM (CPMS) , BUILDING 1 & 4 ; 2013
  • AJIYA SAFETY GLASS FACTORY (AMATA CHONBURI) : INSTALLATION OF AIR CONDITIONING SYSTEM ; 2013
  • KIMPAI LAMITUBE CO., LTD. : INSTALLATION OF AIR COOLED CHILLER ; 2013
  • PAOLO MEMORIAL PHAHOLYOTHIN : COMBINED OF CHILLER PLANT , BUILDING 1 & 4 ; 2013
  • SHELL, LERTVANICH BRANCH 2 (DINDAENG) STATION, BANGKOK : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013
  • SHELL, CHONGNONTEE STATION, BANGKOK : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013
  • SHELL, LADPRAO STATION, BANGKOK : REPLACEMENT OF AIR CONDITIONING FOR SELECT SHOP UNDER AUTHORIZED BY JCI ; 2013
  • CENTRAL PINKLAO : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2013
  • AIKCHOL HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR CCU & CATH LAB UNDER AUTHORIZED BY JCI ; 2013
  • PAOLO MEMORIAL NAWAMIN : REPLACEMENT BUTTERFLY VALVE FOR COOLING TOWER ; 2013
  • TOTAL E&P THAILAND (HEAD OFFICE) : REPLACEMENT OF AIR CONDITIONG SYSTEM FOR SERVER ROOM ; 2013
  • GRAND HYATT ERAWAN : REPLACEMENT OF PIPING ON FLOOR 19 ; 2013
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF CHILLED WATER AIR CONDITIONING FOR PROJECT BIG BOX ; 2013
  • STATE ENTERPRISE POLICY OFFICE (SEPO) : COMMISSIONING AIR CONDITIONING SYSTEM FOR HEAD OFFICE ; 2013
  • PAOLO MEMORIAL PHAHOLYOTHIN : REINSULATE CHILLED WATER PIPE IN RISER , BUILDING 1 ; 2013
  • YUASA BATTERY (THAILAND) : INSTALLATION OF SPOT COOLING FOR PRODUCTION LINE ; 2014
  • AIKCHOL 2 HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR OPD, ICU & SSO UNDER AUTHORIZED BY JCI ; 2014
  • BEIERDORF : RENOVATION OF AIR CONDITIONING SYSTEM UNDER AUTHORIZED BY JCI ; 2014
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF PPR PIPE ON 19th FLOOR, BUILDING 1 ; 2014
  • NATIONAL BROADCASTING SERVICES OF THAILAND (NBT) : REPLACEMENT OF VSD SCREW AIR COOLED CHILLER 210 TR x 2 SETS AND COMMISSIONING ; 2014
  • CAPITAL MARKET ACADEMY (CMA) : INSTALLATION OF AIR CONDITONING SYTEM – SPLIT TYPE – CASSETTE TYPE ; 2014
  • AJINOMOTO CO., (THAILAND) LTD. PATHUMTHANI FACTORY : INSTALLATION OF AIR CONDITONING SYTEM WITH DUCT WORK ; 2014
  • PREECHA COMPLEX : REPLACEMENT OF FIRE PUMP WITH INSTALLATION AND COMMISSIONING SYSTEM ; 2014
  • ASAWANN COMUNITYMALL SAMSEN : RENOVATION OF AIR CONDITONING SYTEM ; 2014
  • TDK (THAILAND) : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2014
  • ASAWANN SHOPING COMPLEX 2 NONGKHAI : INSTALLATION OF AIR CONDITONING SYTEM – VSD SCREW AIR COOLED CHILLER PLANT 450 TR x 1 SET, 250 TR x 2 SETS, AHU&FCU AND FIRE FIGHTING SYSTEM ; 2014
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF PPR PIPE ON 2ND FLOOR, BUILDING 1 ; 2014
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF PPR PIPE ON 11th FLOOR, BUILDING 1 ; 2014
  • CENTRAL PINKLAO : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 2 SETS UNDER AUTHORIZED BY JCI ; 2014
  • AJINOMOTO CO., (THAILAND) LTD. PATHUMTHANI FACTORY : INSTALLATION OF AIR CONDITONING SYTEM FOR PACKING ROOM ; 2014
  • PHYATHAI 1 HOSPITAL : REINSULATE CHILLED WATER PIPE FOR CORRIDOR WARD 6A ; 2014
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF PPR PIPE FROM CHILLER PLANT TO COOLING TOWER, BUILDING 4 ; 2014
  • AMBASSADOR JOMTIEN PATTAYA : REPLACEMENT OF WATER COOLED CHILLER 1000 TR x 3 SETS UNDER AUTHORIZED BY JCI ; 2014
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF AHU FOR CORRIDOR ON 7th FLOOR, BUILDING 4 ; 2015
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF FCU FOR EXECUTIVE ROOM ON MC FLOOR, BUILDING 1 ; 2015
  • AIKCHOL 1 & 2 HOSPITAL : REPLACEMENT OF AIR COOLED CHILLER 5 SETS UNDER AUTHORIZED BY JCI ; 2015
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF AHU FOR DATA CENTER ROOM ON 12th FLOOR, BUILDING 1 ; 2015
  • AIKCHOL 2 HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR MALE PATIENT ROOM ON 3rd FLOOR AND ADMIN. BLD. ON 4th FLOOR UNDER AUTHORIZED BY JCI ; 2015
  • ITAL THAI TOWER : REPLACEMENT OF WATER COOLED CHILLER 700 TR UNDER AUTHORIZED BY JCI ; 2015
  • AIKCHOL 1 HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR MATERNITY WARD ON 2nd FLOOR UNDER AUTHORIZED BY JCI ; 2015
  • PAOLO MEMORIAL PHAHOLYOTHIN : RENOVATION OF CW PIPE ON 3rd FLOOR, BUILDING 1 ; 2015
  • UOB @SATHON BUILDING : REPLACE ALL AHU’S MONITORING EQUIPMENT IN ROBOT BUILDING ; 2015
  • AIKCHOL 1 HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR BUILDING 1 & 2 UNDER AUTHORIZED BY JCI ; 2015
  • ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS) : REPLACEMENT OF AC SYSTEM ON FLOOR G & 1 ; 2015
  • AIKCHOL 1 HOSPITAL : RENOVATION OF AIR CONDITIONING SYSTEM FOR ICU NEGATIVE PRESSURE, POSITIVE PRESSURE.& STERILE ROOM UNDER AUTHORIZED BY JCI ; 2015
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AHU 20 TR 6 SETS FOR PRINTING ROOM CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUST DUCT SYSTEM IN AZ-PERSO ROOM (PHRAPRADAENG PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : REINSULATING OF CHILLED WATER PIPE FOR DATA PREP SB CARD 3 ROOM (PHRAPRADAENG PLANT) ; 2016
  • CENTRAL CHONBURI : REINSULATING OF CHILLED WATER PIPE ; 2016
  • ASAWANN PHONPHISAI : INSTALLATION OF AIR CONDITIONING SYSTEM AND FIRE FIGHTING SYSTEM ; 2016
  • PAOLO MEMORIAL PHAHOLYOTHIN : RENOVATION OF AIR CONDTIONING SYSTEM FOR ORTHO BUILDING 3 ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUST SYSTEM FOR MIYAKOSHI (PHRAPRADAENG PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF EXHAUST FAN & MC.PP, CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING ROOM CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AIR CONDITIONING SYSTEM FOR GSD & PB (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF WATER COOLED CHILLER 500 TR (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2016
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF PPR PIPE ON 3rd & 4th FLOOR, BUILDING 1 ; 2016
  • PHYATHAI NAWAMIN HOSPITAL : REPLACEMENT OF CONDESER WATER PUMP ; 2016
  • PAOLO MEMORIAL PHAHOLYOTHIN : RENOVATION OF HVAC SYSTEM CAPEX ; 2016
  • BIOLAB, BANGPOO INDUSTRAIL ESTATE : REPLACEMENT OF MONITORING EQUIPMENT FOR AHU 1-6 WHR ; 2016
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AIR CONDITIONING SYSTEM FOR BUILDING A & B (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING ROOM CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • SIAM RUBBER CO., LTD : INSTALLATION OF TEMPERATURE AND HUMIDITY CONTROL AHU FOR WAREHOUSE 3-5, VMI BUILDING PHASE 2 ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF CHILLED WATER PIPE FOR CD74-04 TO CD74-03 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • THE NATIONAL LIBRARY OF THAILAND : REPAIRING OF AIR COOLED CHILLER “YORK” MODEL-YCIV1000SA50VA 2 SETS ; 2017
  • PHYATHAI NAWAMIN HOSPITAL : REPLACEMENT OF CONDESER WATER PUMP – CDP NO.2 ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR PRINTING MACHINE CD74-04 AND INK MIXING (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF COMPRESSED AIR PIPE FOR CSK2-CSK3 AND PP ROOM-CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR FLEXIBLE PACKAGING – SCC (PHRAPRADAENG PLANT) ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR AZ SB CARD 2nd FLOOR (PHRAPRADAENG PLANT) ; 2017
  • HOTEL MANHATTAN SUKHUMVIT BANGKOK : INSTALLATION OF OIL FREE MAGNETIC BEARING CHILLER 250 TR AND NEW CHILLER ROOM ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF VENTILATION SYSTEM FOR MOD PP (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2017
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF FCU AND RELOCATE AHU FOR LASER PERFORATING MACHINE – CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2018
  • PHYATHAI NAWAMIN HOSPITAL : REPLACEMENT OF CONDESER WATER PUMP – CDP NO.1 ; 2018
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF SPIRAL EXHAUST DUCT FOR UV INKJET M/C NILPETER 01 LABEL-CSR (SUKSAWAD PLANT) ; 2018
  • MAJOR CINEPLEX – ASWANN 1 : INSTALLATION OF AIR CONDITIONING AND FIRE FIGHTING SYSTEM ; 2018
  • CENTRAL WORLD : REPLACEMENT OF COOLING COIL AHU NO. 11 AND 12 5th FLOOR ; 2018
  • JIENG FUTURE PLAZA – ASWANN 1 : REPLACEMENT OF AIR HANDLING UNIT 40 TR X 4 SETS ; 2018
  • THE NATIONAL BROADCASTING SERVICES OF THAILAND : REPLACEMENT OF CONDENSER COIL FOR AIR COOLED CHILLER NO. 1 SYSTEM #2 ; 2018
  • PHYATHAI NAWAMIN HOSPITAL : INSTALLATION OF FIRE BARRIER FOR ELECTRICAL SHAFT ; 2018
  • ITAL THAI TOWER : RENOVATE OF EXHAUST DUCT FOR FOOD COURT 2nd FLOOR ; 2018
  • CENTRAL WORLD : REPLACEMENT OF CW-STEEL GALVANIZED PIPE ON BASEMENT 3 FLOOR ; 2018
  • ITAL THAI TOWER : INSTALLATION OF AIR CONDITION FOR OFFICE (B) 366.5 SQ.MM BASEMENT 1 FLOOR ; 2018
  • CENTRAL RAMA 9 : INSTALLATION OF MECHANICAL AND ELECTRICAL FOR SHOP 204 ; 2018
  • CENTRAL RAMINDRA : RENOVATION OF VENTILATION SYSTEM FOR CAR PARK ; 2018
  • ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS) : AIR CONDITIONING SYSTEM FOR RAW BEDDING ROOM ; 2018
  • FB BATTERY FACTORY : INSTALLATION OF CHILLER PLANT FOR CHARGER ROOM ; 2019
  • ARMED FORCES RESEARCH INSTITUTE OF MEDICAL SCIENCES (USAMD-AFRIMS) : REPLACEMENT OF COMPRESSOR FOR AC SYSTEM ; 2019
  • ELITE KRAFT PAPER-HEAD OFFICE : RENOVATION OF CHILLER FOR AIR CONDITIONING SYSTEM ; 2019
  • ITAL THAI TOWER : REPLACEMENT OF AIR CONDITION FOR K BANK 1ST FLOOR ; 2019
  • ITAL THAI TOWER : REPLACEMENT OF AIR CONDITION FOR DISCOVERY BOOK STORE ; 2019
  • ITAL THAI TOWER : INSTALLATION OF AUTOMATIC SPRINKLER OF FIRE PROTECTION SYSTEM FOR CAR PARK 1ST FLOOR BANGKOK OFFICE 4 ; 2019
  • SIAM RUBBER : INSTALLATION OF COOLING TOWER PLANT FOR MACHINE COOLING PROCESS ; 2019
  • PHYATHAI NAWAMIN HOSPITAL : INSTALLATION OF AHU FOR CHILLER PLANT & ELECTRICAL ROOM ; 2019
  • PAOLO MEMORIAL PHAHOLYOTHIN : INSTALLATION OF AHU 14TH FLOOR, BUILDING 1 ; 2019
  • CHANWANISH SECURITY PRINTING CO., LTD : RELOCATE AHU FOR PRESS ROOM – CSK2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2019
  • HOTEL MANHATTAN SUKHUMVIT BANGKOK : RENOVATION OF AIR CONDITIONING SYSTEM FOR 200 HOTEL ROOMS ; 2019
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF COMPRESSED AIR PIPE FOR – CSK5/1 AND CSK5/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2019
  • ITAL THAI TOWER : REPLACEMENT OF AIR CONDITION FOR ADECCO ON 11TH FLOOR ; 2019
  • ITAL THAI TOWER : INSTALLATION OF PACKAGE WATER COOLED AIR CONDITIONER FOR UNIT 2 (604 SQ.M) B1 FLOOR ; 2019
  • FB BATTERY FACTORY : INSTALLATION OF AIR HANDLING UNIT FOR EXISTING CHARGER ROOM ; 2019
  • PAOLO MEMORIAL PHAHOLYOTHIN : REPLACEMENT OF MOTORIZED BUTTERFLY VALVES ; 2019
  • CENTRAL WORLD : REPLACEMENT OF CHILLED WATER COIL FOR AHU NO.9 AND 10 ON 5TH FLOOR ; 2019
  • ITAL THAI TOWER : RENOVATION OF AIR CONDITIONING AND VENTILATION SYSTEM FOR LVMH ON 16TH FLOOR ; 2019
  • CENTRAL WORLD : REPLACEMENT OF 2 WAY CONTROL VALVE FOR AHU ON 2ND FLOOR AND 5TH FLOOR ; 2019
  • THE INSTITUTE OF PUBLIC RELATION : REPAIRING OF CHILLED WATER PUMP AND ACCESSORIES ; 2019
  • AMAZON PAPYRUS : INSTALLATION OF ELECTRICAL SYSTEM, STRUCTURE AND INTERIOR WORK FOR OFFICE ; 2019
  • PAOLO RANGSIT HOSPITAL : INSTALLATION OF EXHAUST FAN FOR WASTE WATER TREATMENT ROOM ; 2019
  • PAOLO RANGSIT HOSPITAL : INSTALLATION OF FAN COIL UNIT FOR OR 3RD FLOOR ; 2019
  • ITAL THAI TOWER : REPLACEMENT OF AIR HANDLING UNIT ON 18TH FLOOR ; 2019
  • PAOLO RANGSIT HOSPITAL : INSTALLATION OF AIR CONDITIONING SYSTEM FOR ELECTRICAL ROOM ON 8TH FLOOR, UPS ROOM ON OR 3RD FLOOR AND VENTILATION SYSTEM FOR TREATMENT ROOM ON B1 FLOOR ; 2019
  • CHAMCHURI SQUARE : INSTALLATION OF AIR HANDLING UNIT AND FAN COIL UNIT ON 11TH FLOOR ; 2020
  • ITAL THAI TOWER : REPLACEMENT OF AIR HANDLING UNIT No.16-03 FOR LVMH OFFICE ON 16TH FLOOR ; 2020
  • PHRA NAKHON SI AYUTTHAYA HOSPITAL : RENOVATION OF OR-OPERATION ROOM No.2 AND 3 ; 2020
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF WATER COOLED CHILLER 1000 TR AND COMBINED CHILLED WATER PIPE FOR CSK1 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020
  • THE INSTITUTE OF PUBLIC RELATION : REPLACEMENT OF COLD WATER PIPE AND ACCESSORIES ON 1ST FLOOR ; 2020
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF COMPRESSED AIR PIPE FOR CLEAN ROOM FULFILLMENT 3 AT CSK5/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020
  • CHANWANISH SECURITY PRINTING CO., LTD : INSTALLATION OF AIR CONDITIONING SYSTEM FOR CLEAN ROOM FULFILLMENT 3 AT CSK5/2 (SINSAKORN INDUSTRIAL ESTATE PLANT) ; 2020
  • PHYATHAI NAWAMIN HOSPITAL : REPLACEMENT OF BUTTERFLY VALVE FOR COOLINRG TOWER PLANT ; 2020
  • UOB BANK, PHET KASEM : RENOVATION OF SPRING ISOLATOR SUPPORT FOR CHILLER PUMP BUILDING A AND C ; 2020
  • CENTRAL WORLD : REPLACEMENT OF KW PIPE SUS304 FOR SHABUSHI ; 2020
  • THE INSTITUTE OF PUBLIC RELATION : REPAIRING OF AIR HANDLING UNIT AND FAN COIL UNIT ; 2021
  • SALEE PRINTING PCL. : RENOVATION OF CHILLER PLANT WITH HYBRID AIR COOLED CHILLER ; 2021
  • NSK ASIA PACIFIC TECHNOLOGY CENTRE (THAILAND) COMPANY LIMITED : RENOVATION OF AIR CONDITIONING SYSTEM (VRF – VARIABLE REFRIGERANT FLOW) AND ELECTRICAL SYSTEM ; 2021
  • THE PUBLIC RELATIONS DEPARTMENT : RENOVATION OF AIR CONDITONING SYSTEM (CHILLER PLANT AND ALL EQUIPMENT) FOR RAMA VI HEAD OFFICE ; 2021
  • CENTRAL WORLD : REPLACEMENT OF COLD WATER PIPE ON 31th FLOOR ; 2021
  • CENTRAL WORLD : REPLACEMENT OF COLD WATER PIPE ON GROUND FLOOR ; 2021
  • CHANWANISH SECURITY PRINTING CO., LTD : REPLACEMENT OF DUCT’S INSULATION FOR S/B 1 AND S/B 2 ON 3rd FLOOR (PHRAPRADAENG PLANT) ; 2021
  • ASAWANN – SHOPPING COMPLEX 2 (NONGKHAI) : REPLACEMENT OF CONDENSER COIL FOR AIR COOLED CHILLER NO. 1, 2 AND 3 (400 TRx1 SET AND 250 TRx2 SETS ; 2021
  • UDONTHANI HOSPITAL : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE AT EXCELLENCE CENTER BUILDING ; 2021
  • EGAT – BANGPAKONG TRAINING CENTER : REPLACEMNT OF AIR COOLED CHILLERS AND CHILLED WATER PUMPS ; 2021
  • QUEEN SIRIKIT HOSPITAL : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE ; 2021
  • THE GOLDEN JUBILEE MEDICAL CENTER : REPLACEMENT OF AIR HANDLING UNIT 6 SETS ; 2021
  • ITAL THAI TOWER : INSTALLATION OF AUTOMATIC SPRINKLER OF FIRE PROTECTION SYSTEM FOR LPG STORAGE FACILITY ; 2021
  • THE GOLDEN JUBILEE MEDICAL CENTER : REPLACEMENT OF INSULATION FOR CHILLED WATER PIPE ; 2021