MECHANICAL WORK

  • THE ORIENTAL HOTEL : INSTALLATION OF MAKE-UP WATER SYSTEM AND SANITARY SYSTEM WITH CONTROL EQUIPMENT ; 2002
  • THE ORIENTAL HOTEL : INSTALLATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM (ADDITIONAL); 2002
  • THONBURI ENTERTAINMENT COMPLEX : REPAIRTION AND RENOVATION OF AIR CONDITIONING SYSTEM AND COOLING TOWER; 2003
  • JIENG FUTURE PLAZA. NONGKAI PROVINCE : INSTALLATIN OF AIR VENTILATION; 2003
  • CHAN WANICH SECURITY PRINTING CO., LTD. : INSTALLATION OF AIR CONDITIONING SYSTEM; 2003
  • CHAOPHRAYA PARK HOTEL : PROCUREMENT OF AIR CONDITIONING ACCESSORIES AND HEATING EQUIPMENT; 2003
  • JIRATIP VILLAGE (PHASE SOI WATCHARAPHOL) : PROCUREMENT AND INSTALLATION SPLIT TYPE UNIT 35 SETS; 2003
  • PHRAYATHAI 3 HOSPITAL : RENOVATION OF COOLING TOWER 1000 RT, 4 UNITS; 2003
  • CHALERMTHAI SHOPPING MALL (CHONBURI) : RENOVATION OF COOLING TOWER 350 RT, 4 UNITS; 2003
  • PACIFIC PARK (SRIRACHA, CHONBURI) : INSTALLATION OF SUPPLY AIR DUCT AND VENTILATION SYSTEM; 2003
  • ORIENTAL HOTEL : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR SAND FILTER TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2003
  • ORIENTAL HOTEL : INSTALLATION WORK OF MAKE-UP WATER SYSTEM FOR ROOF TANK WITH CONTROL UNIT AND SANITARY SYSTEM; 2004
  • ONE TWO SING (SILOM RD.), ENTERTAINMENT COMPLEX : PURCHASING AND INSTALLATION WORK OF SPLIT TYPE UNIT AMOUNT 31 SETS; 2004
  • NARAI HOTEL : PURCHASING AND INSTALLATION WORK OF CIRCULATING WATER PUMP FOR CHILLER WATER SYSTEM AMOUT 6 SETS; 2004
  • TETRAPAK (THAI) : PURCHASING AND INSTALLATION WORK OF WATER COOLED CHILLER 200 TR WITH ACCESSORIES 1 UNIT; 2004
  • UTILITY BUSINESS ALLIANCE (NONG-KHAM, WATER TREATMENT PLANT) : PURCAHASING SYNTHETIC FILTER FOR AIR CONDITIONING SYSTEM; 2004
  • THAI NOK (AMATA CITY, CHOLBURI PLANT) : INSTALLATION WORK OF AIR COOLED CHILLER WITH EQUIPMENT AND ACCESSORIES; 2004
  • SIAM JUSCO, RUJCHADAPISEK BRANCH : RENOVATION OF AIR CONDITIONING SYSTEM ; 2004
  • Johnson & Johnson : DESIGN AND INSTALLATION WORK OF HEAT EXCHANGER FOR COOLING AIR COMPRESSOR SYSTEM; 2004
  • SILOM COMPLEX : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004
  • TETRAPAK (THAI) : PURCHASING AND INSTALLATION WORK OF CONDENSER WATER PUMP WITH PIPING AND ACCESSORIES 1 UNIT; 2004
  • GRAND HYATT ERAWAN : INSTALLATION WORK OF COOLING TOWER WITH PIPING AND ACCESSORIES; 2004
  • BANK OF AYUDHYA, RAMA III HEAD OFFICE : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR TRAINING CENTER ON 16th FL; 2004
  • BANK OF AYUDHYA, RAMA III HEAD OFFICE : RENOVATION WORK OF AIR CONDITIONING SYSTEM FOR FOREIGN BANKNOTE ON BASEMENT 1; 2005
  • HI-MALL, (MACKRO) BANGKABUE : CONSULTANT OF ENGINEERING SYSTEM; 2005
  • MUANG-THAI LIFE ASSURANCE BUILDING (RAJCHADAPISEK RD.), HEAD OFFICE : RENOVATION WORK OF TRAINGING CENTER 12th FL; 2005
  • WYNCOAST INDUSTRIAL PARK (PUBLIC) CO., LTD., FACTORY AT BANPAKONG, CHACHEANGSAO : RENOVATION OF AIR CONDITIONING SYSTEM; 2005
  • TETRAPAK (THAI) : RENOVATION OF SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005
  • MISTER DONUT, HI-MALL, (MACKRO) BANGKABUE : INSTALATION OF MAIN SUPPLY AIR DUCT AND AIR VENTILATION SYSTEM ; 2005
  • TETRAPAK (THAI) : RENOVATION OF AIR CONDITIONING SYSTEM; 2006